Battery Energy Storage System Design: A C&I Guide
Start with the operating objective
Battery energy storage system design begins with the site's electrical requirements, not a cabinet model. A commercial facility may want to reduce maximum grid demand, use more on-site solar energy, maintain essential loads during an outage, or combine these objectives. Each changes the dispatch schedule and the amount of stored energy that must remain available.
Collect interval electricity data, preferably across representative seasons, including demand peaks, operating hours, PV generation and the utility tariff. Note the grid connection rating, available installation space and any export restrictions. Define which loads must continue during a power interruption and which can be disconnected.
Calculate power and energy separately
Power in kW determines how much load the battery system can serve at a given moment. Energy in kWh determines how long that power can be sustained. A hypothetical site needing 100 kW for two hours would require 200 kWh of delivered energy before accounting for losses, reserve state of charge, degradation and temperature-related operating limits. A 200 kWh nominal battery is therefore not automatically sufficient.
Evaluate the maximum simultaneous load, motor starting requirements, phase imbalance and the power conversion system (PCS) rating. If the project combines demand reduction and backup, reserve sufficient energy for the backup requirement instead of allocating the entire battery to daily peak shaving.
Choose the system architecture
AC-coupled storage can be considered when integrating storage on an AC bus or retrofitting an existing solar installation. A DC-coupled or integrated hybrid system may suit projects designed around PV and storage together. Select an architecture after comparing equipment compatibility, conversion paths, grid requirements and control needs.
Explore YIY's AC-coupled battery storage systems and hybrid energy storage systems. For power conversion, compare the PCS range.
Design review checklist
- Confirm load intervals, tariff and the required discharge duration.
- Define usable energy, reserve state of charge and operating temperature.
- Confirm PCS, battery management system (BMS) and energy management system (EMS) compatibility.
- Review protection, site layout, ventilation, fire safety and applicable grid and electrical requirements with qualified engineers.
- Agree on commissioning tests and acceptance criteria before purchasing equipment.
Review the documented system ratings on the commercial storage project cases page for examples of installed power and energy combinations. These are project references, not guarantees of suitable sizing for another site.
For your own design, use the C&I on-grid solution as a starting point and provide the load profile and operating goals when requesting a configuration.